Contract - Farb Middle

PROJECTS TO BE ACCOMPLISHED BY PROPOSITION MM AT
FARB MIDDLE SCHOOL
4880 La Cuenta Drive
San Diego, CA 92124
(619) 496-8090

A bond measure is on the November 3, 1998, ballot to raise money to repair our neighborhood schools. Following voter approval, the projects listed below will be completed at this school. In addition, the school will be allocated sufficient classroom space to support extended-day kindergarten and $100 per student to fund other site-specific repairs or improvements eligible for bond expenditures. If Proposition MM passes, Farb Middle will receive repairs and improvements in the following categories: 

  • Major Repairs
  • Library Expansion
  • Science Classrooms
  • Lunch Court Cover
Detailed descriptions of the specific projects that will be completed with a successful bond measure appear below.

MAJOR REPAIRS AND REPLACEMENT WHICH INCLUDES:

  • Repair/replace outdated electrical systems.
  • Repair/replace carpeting.
  • Repair/replace damaged ceiling tiles.
  • Interior/exterior painting. 
  • Repair/replace door and window assemblies as needed. 
  • Replace asphalt tile.
  • Repair/replace asphalt and concrete paving (playgrounds, athletic courts)
CODE COMPLIANCE TO MEET STATE AND FEDERAL SAFETY REGULATIONS
  • Modifications required by code to improve ventilation.
ADDITIONAL LIBRARY FACILITIES
Based on specific site conditions, this project will either expand the existing library or construct a new library.

UPGRADE SCIENCE CLASSROOMS AND LABORATORIES
Science classroom facilities will be upgraded, where needed, to accommodate the new district standards for laboratory science courses. Science classrooms built before the 1990's will be remodeled, and new science classrooms may be added.

A PERMANENT LUNCH COURT STRUCTURE WILL BE CONSTRUCTED

MAJOR ADDITIONS
Construct permanent shower/locker facility for middle school physical education program.


Declaration of Need and Statement of Assurance
In response to the urgent repair needs of our aging schools, the Board of Education voted to place a Repair Our Neighborhood Schools bond on the November 3, 1998, general election ballot.

Proposition MM will pay for urgent repairs and renovations needed at each of the district's 167 schools and will improve existing classrooms, construct new classrooms, upgrade electrical systems for technology, build libraries and science classrooms, and ensure all schools meet safety regulations.

Following voter approval of Proposition MM on November 3, 1998, the Board of Education hereby agrees to carry out the projects listed in this contract for
 

Farb Middle School


By entering into this contract, the Board of Education will create a binding obligation between the San Diego Unified School District and this neighborhood school. Further, an Independent Citizens' Oversight Committee has been established to ensure that the terms of this contract are fulfilled.

Date: September 10, 1998

Approved by:

Alan Bersin
Superintendent of Public Education
Mildred Phillips
Principal
Carol Komaki
Parent

Board of Education


Ron Ottinger, President

 
Francis O'Neill Zimmerman   Sue Braun
 
John de Beck   Ed Lopez

<< Back to main Existing Schools page
 


SDUSD Home | About the District | Board of Education | Employment | Enrollment Options | For District Staff
For Parents | News | Offices & Departments | Our Schools | Proposition MM | Site Map | Student Testing | Superintendent

San Diego Unified School District • Eugene Brucker Education Center • 4100 Normal St.• San Diego • CA • 92103 • (619) 725-8000